Newsletter subscribe
Tag: Mooring System
Jumbo

Jumbo completes installation of mooring system offshore Egypt

Posted: July 2, 2019 at 12:37 pm   /   Oil & Gas

Jumbo’s Fairplayer has completed the pre-installation and tensioning of a shallow water CALM buoy mooring system for the Mersa El-Hamra terminal offshore Egypt. Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 tonnes. The work was conducted for the […]

No Comments read more