Petrobel to increase Nooros field production to 700 mcf/d in September

PetrobelThe Nooros field production is expected to increase to 700 mcf/d following the completion of drilling by September, field general manager Hassan Fouad told Al Borsa.

The Nooros field is an important gas discovery owned by Eni and BP, and was drilled by Petrobel, a joint venture between Eni subsidiary IEOC and EGPC. Current Nooros production levels are at 300 mcf/d in additional to 3k bbl of condensates from four completed development wells, he added.

(Source: Enterprise.press)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s